The region of Fortaleza, in the Brazilian state of Cear√°, was selected as the location for the construction of the SACS submarine cable station and development of a Data Center capable of receiving traffic from several cables in the same region.

Angola Cables is building a data center at Praia do Futuro, in Fortaleza, Brazil, where submarine cables will also land. This Tier3 Data Center will be developed in a phased manner and in line with market demand. It has as great concern the optimization of energy consumption and intends to have the lowest PUE possible.

Key features:

  • Redundancy services;
  • Safety and reliability;
  • Access to high-speed networks;
  • DC and AC electricity are constant and redundant;
  • Cooling systems;
  • Support and total system monitoring 24 hours a day, 7 days a week;
  • SLA of 99.999{02aa93cde9f2ef725f5d0916892cfc77f44aede0dd89bd95b195951d073f4228}.
  • Ready to accommodate future growth.